–(1)Determine pump capacity by using the 7 minute peak demand and number of
fixtures
____ GPM
–(2)Determine the minimum pump running
time in
min.
•Up to and including ¾
hp………....1 minute
•1 to 2 hp…………………………..2
minutes
•Greater than 2 hp…………………3
minutes
•
____ minutes