TDH = L + F + P
•
L = Total vertical
Lift
from pumping level in the
well to the point of delivery, in feet.
•
•
F = Total of
Friction
losses, expressed as head
in feet.
•
P =
Pounds
pressure needed to operate the
system, converted into feet of head.